Handwritten log for Svalbard Dynasonde, 2010.
20100125
Checked conditions, lots of snow.(ML). B2min during SPEAR heating. 20100329
Problem with the lack of power out of the A300 solved (ML). Changed the Alan 500A31 attenuator on the input. 20100406
Changed 5V, 15V and 28V poer supplies. 20101018
Lisa, Martin and Mick fixed Tx antenna mast.
20101022
Rebooted both computers after power break yesterday.