06:42:17 Tuesday 3 May 2016, Mike Rietveld on 129.242.31.83 Manda on VHF yesterday, 2 may 2016, was without klystron power but we ran the IPA at about 1.6 kW into the B side for a first test. Antennas were all vertical. On 3rd May 2016, a second test starts with panels 3&4 (B side) at 104 deg. Tests by RJ, SG, MTR etc. 06:59:45 Tuesday 3 May 2016, Mike on 129.242.31.83 2 May 2016 experiment, Ingemar played around with the clutter/TR switch ranges. 07:13:30 Tuesday 3 May 2016, Mike on 129.242.31.83 A meteor is seen at least once on the tilted beam with nothing in the vertical (no tx) beam. Good. 10:36:31 Tuesday 3 May 2016, Mike on 129.242.31.83 3 May: data recording stopped at 09:00:09 UT for some strange reason and goppi hung with a CPU process 100% (kworker)